
(which is linked to
BIAC
CDB).
{ Transmittal of
TOBT
-H: From
EOBT
– 40
MIN
till
EOBT
– 20
MIN
.
For non-regulated flights:
ETOT
=
EOBT
+ taxi out time.
For regulated flights:
CTOT
=
EOBT
+ taxi out time.
Taxi out time is set at 15
MIN
(under normal weather conditions) for departure
RWY
25R and 20
MIN
for
RWY
25L, 20, and the combination
RWY
02 and 07R.
Transmissions of new
TOBT
-H is limited to a maximum of 3 times.
{ Processing of
TOBT
-H by
ATC
(Tower Delivery Position), resulting in acceptance or change into
a new value:
TOBT
-S (can never be earlier than
TOBT
-H).
z
TOBT
Acronyms:
z Pilots will call "Brussels Delivery" only when they are ready for start-up in accordance with their
CFMU
slot (and related
TOBT
-S ± 3
MIN
) if any, for push-back and/or ready for taxi immediately after
reception of
ATC
clearance.
z A Clearance Delivery Service (DCL) through a Digital Data Link is implemented at Brussels
TWR
.
z The
DCL
via Data Link implemented through the Aircraft Communication Addressing and Reporting
System (ACARS) uses the
SITA
which complies with the requirements and recommendations
specified in
EUROCAE document ED 85.
z For the
DCL
via Data Link operations, the user should use a certified on-board equipment according to
the recommendations specified in
ED 85 document
, and comply with the whole operational
procedures which overcome the risks identified in
ED 85 document
.
z Prior to be authorized to use the Brussels
DCL
service, an operator shall apply to the National
Authority responsible for his own operational oversight (or to the State of registry when appropriate) to
obtain technical and operational approval to use departure clearance over
ACARS
.
z When obtained, copy of such authorization granted by the competent authority shall be sent to
Belgocontrol.
Mail:
BELGOCONTROL
DGO
CCN
Rue du Progrès / Vooruitgangstraat, 80 Box 2
B - 1030
Brussels
The document shall mention for each authorized aircraft the type and registration. The operator must
mention his
ICAO
and
IATA
aircraft operating agency designator.
z Operational use
a. The
DCL
Service via Data Link can only be applied to aircraft using
SID
s whose specifications
include level requirements.
b. The
DCL
Service via Data Link does not provide clearance revision. Any clearance modification
will be made by voice on the
FREQ
of "Brussels Delivery".
c. Pilots shall request the departure clearance via Data Link only when they will be ready for start-
up in accordance with their slot if any, ready for push-back and/or ready for taxi immediately
TOBT
Target off block time
Handler
TOBT
-H
Target off block time with indicator H => confirmation of estimated
ready time by the Airliner/Handler
TOBT
-C
Target off block time Void (by Aircraft Operator or Handler) (Void =
Cancelled)
ATC
TOBT
-S
Target off block time Start-Up Sequence confirmation of the aircraft
based on the
TOBT
-time (by Tower Delivery Controller)
TOBT
-D Target off block time Denied (by Tower Delivery Controller)
TOBT
-N
Target off block time New (Renewal of
TOBT
-S (by Tower Delivery
Controller)
TOBT
-X
Target off block time Void, e.g. in case of airport disruption (fog, de-
icing, ...) (by Tower Delivery Controller)
Pa
e 36 of 60en-GB AIP for Bel
ium and G.D. of Luxembour
section AD-2.EBBR
valid from 29 ...
03/09/2005file://D:\eAIP
AIRAC\html\eAIP\EB-AD-2.EBB
-en-GB.html
Comentarios a estos manuales