CONTROL SYSTEM
11-3
SM SAFRPM 1-A.0 GB
11.5.5 Defrost
Defrosting of the outdoor heat exchange is controlled by the microprocessor with detection by the
indoor pipe temperature sensor.
Defrost control type is according to the JC on the PCB whether is connected.
1. When the JC is connect on the PCB
When one of the conditions of A, Band C is satisfy, the defrosting operation stars.
In the condition A, it must satisfy the condition a),b) and c) then into defrosting operation.
a) IPT1 satisfy IPT1=IPT
MAX
- ΔIPT (8
O
C)
b) t5≥50 minutes (the compressor cumulative operation time ≥50minutes, t5 is permitted move
and lower than t1 too).
c) IPT <40
O
C, and keep 2 minutes.
According to the condition A enter the defrosting operation, the first defrosting operation time is
8minutes; After defrosting operation one cycle, and then judge and regulate the defrosting operation
time.